Drainage work on #16 fwy
The contractor and engineer are on site and we have commenced installing drainage on #16 fwy.  The tee blocks have been moved up beyond the construction area.  The area on #16 is one of the worst drained areas on the course and most of the problem is on the fairway itself so it will be nice to get this one out of the way.  This area will likely take the rest of the week at which point we will move on to #1 and #2. 